Review/Approve DMR Change Requests

info

All Popout Change Requests are sent to the AE Firm for approval. Only the requester, someone from their company or the PCT Manager role can close the Popout Change Requests.

tip

For the Panel and Circuit change requests (under the Power discipline), the Integration Team (Integration Lead, Integration Team Electrical) will have the first approval, classed as a REVIEW.

If the Integration team rejects the request, the workflow ends and must be closed manually by the company that raised the request.

If the Integration Team approves the review, the flow will move to the next stage for final APPROVAL by the AE Firm. The AE roles from the Stakeholders Matrix (AE Design Lead, AE Designer, AE Electrical Designer, AE Electrical Engineer) can accept or reject the DMR Change Request.

1. Approval Process for Panel and Circuit Change Requests

2. Approval Process for Other Change Requests

Note

Commented and Assigned will NOT appear as a Status anymore. These changes are still being tracked and can be seen using the View (eye) icon.

3. Email Notifications

tip

Users can unsubscribe from DMR emails and other emails. See the section on Managing Site Subscriptions at the end of the User Profile Management page for details. If you are the assignee of a specific DMR, you will be notified about that change request even if you have unsubscribed.

Email notifications are sent out to relevant stakeholders for change requests. There are 4 types of requests:
Panel/Circuit: Requests to change the power panel or the circuit on the panel for a power POC
Electrical/Comms: Any other change request for a power POC or any change for a comms POC
Mechanical: Any change request for a mechanical POC
Popout: Any change request for Popout assignments

The table below shows which groups of users will receive email when each action is taken on a DMR.

RoleCreate/SendAssignReviewApproveRejectCommentClose
Integration Team LeadPanel/Circuit
Elec/Comms
Mechanical
Panel/Circuit
Elec/Comms
Mechanical
Panel/CircuitPanel/Circuit
Elec/Comms
Mechanical
Panel/Circuit
Elec/Comms
Mechanical
Panel/Circuit
Elec/Comms
Mechanical
Panel/Circuit
Elec/Comms
Mechanical
Integration Team MechanicalMechanicalMechanicalMechanicalMechanicalMechanicalMechanical
Integration Team ElectricalPanel/Circuit
Elec/Comms
Panel/Circuit
Elec/Comms
Panel/CircuitPanel/Circuit
Elec/Comms
Panel/Circuit
Elec/Comms
Panel/Circuit
Elec/Comms
Panel/Circuit
Elec/Comms
AE Design LeadPopoutPopoutPanel/CircuitPanel/Circuit
Popout
PopoutPopoutPopout
AE DesignerPopoutPopoutPanel/CircuitPanel/Circuit
Popout
PopoutPopoutPopout
AE Electrical DesignerPopoutPopoutPanel/CircuitPanel/Circuit
Popout
PopoutPopoutPopout
AE Electrical EngineerPopoutPopoutPanel/CircuitPanel/Circuit
Popout
PopoutPopoutPopout
AE Mechanical DesignerPopoutPopoutPopoutPopoutPopoutPopout
AE Mechanical EngineerPopoutPopoutPopoutPopoutPopoutPopout
Tool OwnerPanel/Circuit
Elec/Comms
Mechanical
Popout
TI PMPanel/Circuit
Elec/Comms
Mechanical
Popout
note

For Popout change requests at the Rio Rancho site, the Exyte company project email is also added to the notification list at every step above.

info

The list of recipients is filtered against each user's notification subscription preferences. Users who have unsubscribed from notifications for the tool's site, CEID or functional area will be removed from the list. The assignee is always notified, even if they have unsubscribed.